Report September 1996

Record type
Archival document
Date
September 1996
Length
181 pages
File
PDF · 22.5 MB

About this released record

Department of War archival document dated or associated with September 1996. The archived PDF contains 181 pages.

This page presents the document as supplied in the Release 1 archive. The summary and extracted preview are navigational aids; readers should consult the original PDF for full context, qualifications, redactions, and source markings.

Verify in the official Department of War PURSUE Release 01 archive ↗

Extracted text preview

== �--== -=--=- �=------===--====-==-=--=-=-==- __;;;;._ ____________ _ RESEARCH TRIANGLE INSTITUTE /RTI Contract No ■- FO4703-91-C-0112 RTI Report No. RTl/5180/77-43F September 10, 1996 Modeling Unlikely Space-Booster Failures in Risk Calculations 19961025 122 Final Report Prepared for Department of the Air Force 45th Space Wing (AFSPC) Safety Office - 45 SW/SE Patrick AFB, FL 32925 and Department of the Air Force 3

Read the PDF

Open or download PDF

If the PDF does not appear in your browser, use “Open or download PDF.”